Kohler K-9439-2BZ Installation Guide Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
3. Install the Trim
NOTE: If you are installing the K-T10421 trim, proceed to the
Install the Trim - K-T10421 section of this guide.
Firmly press the valve stem adapter onto the valve stem.
Secure the valve stem adapter to the valve with the correct length
screw, as selected in the Install the Valve Stem Adapter section
of this guide.
Thread the two threaded studs into the threaded holes of the
valve.
Place the front plate assembly over the threaded studs.
Thread the nuts onto the studs to secure the front plate assembly
to the wall. Do not overtighten the nuts.
NOTE: If the front plate assembly does not lay flat on the wall
surface, loosen the nuts and adjust the threaded studs, then tighten
the nuts. The maximum distance between the threaded studs from
the wall is 7/16 (1.11 cm).
Visually inspect the front plate assembly to ensure that the foam
seal is completely covering the wall opening. If not, stop the
installation and repair the wall opening.
Place the escutcheon against the wall. The drain hole in the
escutcheon should face downward in the 6 o’clock position.
Thread the handle assembly onto the hub of the front plate
assembly to secure the escutcheon in place. The handle will be
pointing down to the 6 o’clock position.
Finished Wall
Drain Hole
Thermostatic Valve
Escutcheon
Front Plate Assembly
Valve Stem
Adapter
Handle Assembly
Nuts
Screw
Kohler Co. 5 1041503-2-H
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 27 28

Comments to this Manuals

No comments