Kohler K-T14491-4-BGD Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Adjust the Handle Assembly
NOTE: Valve Operation. Water will flow from a single shower
accessory when the control knob detent lines up with any of the
markings on the escutcheon. Water will flow from two accessories at
the same time when the control knob detent is midway between the
markings.
Ensure the valve stem adapter is lightly placed over the spline
adapter.
Place the handle assembly over the valve stem adapter.
Turn on the water supply to the transfer valve.
Rotate the handle assembly until water begins to flow through
the shower accessory.
Determine the shower accessory that will correspond to the
Accessory A setting at the vertical 12 o’clock position on the
escutcheon for the 3-way installation or 4 o’clock for the 2-way
installation.
Valve Stem
Adapter
Spline Adapter
Transfer Valve
Handle
Assembly
Mixed Water
Supply
A
B
A
C
B
B + C
A + B
A + C
3-Way
2-Way
Accessories
A
C
B
B + A
1041514-2-K 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 27 28

Comments to this Manuals

No comments