Kohler K-T16239-4-CP Installation Guide Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
4. Install the Trim - K-T10421
Firmly press the valve stem adapter onto the valve stem.
Secure the valve stem adapter to the valve stem with the correct
length screw, as selected in the Install the Valve Stem Adapter
section of this guide.
Thread the two threaded studs into the threaded holes of the
valve.
Place the front plate assembly over the threaded studs.
Thread the nuts onto the studs to secure the front plate assembly
to the wall. Do not overtighten the nuts.
NOTE: If the front plate assembly does not lay flat on the wall
surface, loosen the nuts and adjust the threaded studs, then
re-tighten the nuts. The maximum distance between the threaded
studs from the wall is 7/16 (1.11 cm).
Inspect the front seal plate assembly to ensure that the foam seal
is completely covering the wall opening. If not, stop the
installation and repair the wall opening.
Place the escutcheon against the wall. The drain hole in the
escutcheon should face downward in the 6 o’clock position.
Thread the adapter ring onto the hub of the front plate assembly.
Adapter Ring
Setscrew
Escutcheon
Front Plate Assembly
Valve Stem
Adapter
Handle
Assembly
Thermostatic
Valve
Threaded Studs
Nuts
Screw
Finished
Wall
Kohler Co. 7 1041503-2-F
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 27 28

Comments to this Manuals

No comments