Kohler K-14445-BN Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
1. Position the Wall Plate(s)
For Multiple-Post Accessories
Using a level and tape measure, mark the centerpoints of your
multiple-post accessory. Refer to the Roughing-In section of this
guide to assist you.
Orient the wall plate with the small round mounting hole in the
12 o’clock position, as shown.
Align the center of each wall plate at the marked centerpoints.
For Single-Post Accessories
Orient the wall plate with the small round mounting hole in the
12 o’clock position, as shown.
For All Accessories
Mark the mounting hole locations with a pencil. Set the wall
plate(s) aside.
Using the correct type of drill bit for your wall material, carefully
drill pilot holes at the marked mounting hole locations. Refer to
the “Before You Begin” section for proper drill bit diameters.
Mark centerpoints.
Verify level.
Multiple-Post Installations All Installations
Mark
mounting
holes.
Orient
wall plate.
1020118-2-G 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 19 20

Comments to this Manuals

No comments