Kohler K-1913-LW-47 Installation Guide Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 156
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
10. Level and Secure the Bath
All Installations
IMPORTANT! Do not anchor the bath to the stud pocket until instructed to do so.
IMPORTANT! Do not level the bath with the counterweights installed. The counterweights and door
assembly could cause the bath to shift, causing leveling to be incorrect.
Install metal shims under each of the leveling feet to protect the floor.
Check for level on the back edge and each side of the bath as shown.
Adjust the leveling feet as needed to level the bath.
Recheck for level.
Repeat until the bath is level.
Check each of the leveling feet and confirm they make firm contact with the metal shims and
subfloor.
Secure the bath to the studs with nails or screws, using the nailing-in flange.
Leveling Foot Locations
Leveling Foot Locations
Bottom View
Stud
Nail furring strips
to the studs.
Drill a small hole
through the nailing-in
flange at each stud.
Use #6 large-head
galvanized nails to
secure the nailing-in
flange to the studs.
1128532-2-G 20 Kohler Co.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 155 156

Comments to this Manuals

No comments