12. Complete the Finished Wall or Deck
NOTICE: Provide unrestricted service access to the pump, in-line heater, adjustable feet, and control box.
You must construct an access panel to provide sufficient clearance for servicing the pump, in-line heater,
and control box.
Protect the product surface. Cover the framing with water-resistant wall material.
Keep the entire overflow channel area exposed to allow access to the drain overflow, and to permit
easy cleaning of the overflow channel surfaces.
Seal the joints between the rim edge and the water-resistant wall or deck material with silicone
sealant.
Tape and mud the water-resistant wall material.
Install the finished wall to the water-resistant wall material.
Seal the joints between the product rim and the finished wall material with silicone sealant.
13. Install the Faucet Trim
Install the faucet trim according to the instructions packed with the trim.
14. Clean-Up After Installation
When cleaning up after installation, do not use abrasive cleansers, as they may scratch and dull the
bath surface. Use warm water and a liquid detergent to clean the surface.
Remove stubborn stains, paint, or tar with turpentine or paint thinner. Do not allow cleaners
containing petroleum distillates to remain in contact with any bath surfaces for long periods of
time. Remove plaster by carefully scraping with a wood edge. Do not use metal scrapers, wire
brushes, or other metal tools. Use a powder-type detergent on a damp cloth to provide mild
abrasive action to any residual plaster.
Deck
Silicone Sealant
Finished Deck
2x4 Studding
Water-Resistant
Wall Material
Kohler Co. 15 1054216-2-B