Kohler K-1166-C1-96 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Important Product Information (cont.)
Electrical Requirements
The installation must have two Class A Ground-Fault Circuit-Interrupters (GFCI’s) or Earth-Leakage
Circuit-Breakers (ELCB’s). The GFCI/ELCB protects against line-to-ground shock hazard. Use a 208-240 V, 20
A, 50/60 Hz dedicated service for the pump controls. Use a separate 208-240 V, 20 A, 50/60 Hz dedicated
service for the heater.
An equipment grounding terminal is provided in the field wiring compartment. To reduce the risk of
electrical shock, this terminal must be connected to the grounding means provided in the electrical supply
panel with a conductor equivalent in size to the circuit conductors supplying this equipment.
Install this unit in accordance with the Canadian Electric code, Part I.
Tools and Materials
Introduction
Please read these instructions carefully to familiarize yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain to your particular installation. This will help you
avoid costly mistakes. In addition to proper installation, read all operating and safety instructions.
All information in this manual is based upon the latest product information available at the time of
publication. At Kohler, we constantly strive to improve the quality of our products; we therefore reserve the
right to make changes in product characteristics, packaging, or availability at any time without notice.
Before You Begin
Your bath is designed for deck mount installations.
You must install the bath onto an adequately supported, level subfloor.
Provide properly dimensioned framing.
Choose a fill spout which will provide adequate reach and a minimum 2 (5.1 cm) air gap above the
bathing well rim of the overflowing bath. You may need to build up the deck material to obtain
adequate air space because the outer rim may be lower than the bathing well rim depending on the
specific area of the bath.
Follow local plumbing codes.
The bath must be filled with water through the bathing well, not the overflow channel.
• Conventional woodworking
tools and materials
• Drop cloth
• 2x4s or 2x6s
Silicon Sealant 4' (1.2 M)
Level
Tape
Measure
Safety
Glasses
Pencil
Kohler Co. 3 1054216-2-B
Page view 2
1 2 3 4 5 6 7 8 ... 63 64

Comments to this Manuals

No comments