4. Complete the Installation
IMPORTANT! Make drip loops in all cables.
Slide a split boot onto each interface cable.
Connect the interface cable to the valve. Press each cable into the valve socket until it clicks into
place.
Gently pull on each cable to verify it is fully engaged in the valve socket.
Press the boot over the connection and into the valve socket to seal the connection.
If only one interface is installed, insert a solid boot into the unused socket.
5. Installation Checkout
Turn on the water supply to the valve.
Check all connections for leaks and make any adjustments as needed.
Plug in the valve. You should hear the valve power up and the power icon on the user interface will
be lit.
If not already completed, refer to the User Interface User Guide to set up the interface.
NOTE: For more information about using the user interface and its menus, refer to the User Interface
User Guide.
Press the [Power Icon] to turn on the shower.
Check for leaks and make any adjustments as needed.
Verify that the water flow is sufficient for your showering needs.
Slide the split boot onto the
interface cable.
Split Boot
Solid Boot