113169-2-EB
Kohler Co., Kohler, WI U.S.A
SITE PREPARATION
REMOVE EXISTING TOILET
NOTICE: Carefully inspect new fixture for any sign
of damage before removing existing toilet. If any
damage to vitreous china or Pressure Lite system
components are discovered, stop installation and call
place of purchase for assistance.
Inspect the complete toilet to ensure that the:
Components are attached securely.
Trip lever and plunger arm move freely.
Vessel is securely mounted.
Vitreous china is undamaged.
Turn off the water supply.
Flush the toilet, and sponge out all remaining water from
the tank and bowl.
Disconnect the supply stop, and remove the old tank and
bowl.
Remove the old gasket from the wall and outlet flange with
a putty knife.
Remove the old T-bolts (the T-shaped bolts in the closet
flange), and discard.
CAUTION: Risk of hazardous gases. If the new
toilet is not installed immediately, temporarily stuff
a rag in the closet flange.
ROUGH-IN PLUMBING
Turn off the water supply.
Install or relocate the supplies and outlets as necessary
to conform to the roughing-in dimensions.
CAUTION: Risk of trap seal loss in
back-to-back installations. To prevent possible
trap seal loss, the back-to-back Pressure Lite toilet
must be connected to a vertical stack using one of
the following three fittings:
Double fixture fitting
Double combination wye and 1/8 bends
Double wye and 1/8 bends
Double
Fixture
Fitting
Double
Combination
Wye and 1/8
Bends
Double Wye
and 1/8
Bends