Kohler K-4327-0 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 8
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
3Kohler Co., Kohler, WI U.S.A
113169-2-EB
ROUGHING-IN DIMENSIONS
31” (78.7cm)
20-3/4” (52.7cm)
5/8” (1.6cm)
15”
(38.1cm)
28-1/4”
(71.8cm)
8”
(20.3cm)
7”
(17.8cm)
C OF OUTLET
L
3/8” I.P.S. SUPPLY
2-5/8” (6.7cm)
13-1/2”
(34.3cm)
9-1/2”
(24.1cm)
FRONT OF BOWL
28”
(71.1cm)
6” (15.2cm)
1-1/8” (2.9cm)
8-1/4”
(21cm)
4”
(10.2cm)
K-4327
BASE
13-1/2”
(34.3cm)
6-1/2”
(16.5cm)
9-1/2”
(24.1cm)
FRONT OF BOWL
K-4327
BASE
INSTALL SUPPLY STOP
For supply installation, refer to the instructions packed
with the supply stop.
Locate the supply stop so it is 8” (20.3cm) above the floor
line, and 7” (17.8cm) to the left of the closet flange
centerline.
INSTALLATION
Secure the outlet connection or flange with mounting bolts
to the wall according to the manufacturers instructions.
See the roughing-in illustration for the dimensions.
Pre-install the toilet, and mark the location of the floor
bolts. Remove the bowl. Drill mounting holes for 1/4”
(6mm) floor bolts at the desired locations. Do not install
the bolts until after final toilet placement. Remove any
rags or other seal on the outlet horn before setting the
toilet.
Install the closet gasket for sealing the toilet to the outlet
connection. For gasket installation, refer to the
instructions packed with the gasket.
NOTE: For a floor-mounted wall-outlet bowl, an all-wax
ring is not recommended.
If desired, apply a bead of toilet-setting compound
approximately 1/4” (6mm) thick around the base and back
of the toilet.
* Refer to gasket
instructions
* Refer to gasket
instructions
Page view 2
1 2 3 4 5 6 7 8

Comments to this Manuals

No comments