Important Product Information (cont.)
Electrical Requirements
The installation must have a Class A Ground-Fault Circuit-Interrupter (GFCI). The GFCI protects against
line-to-ground shock hazard. Use a 240V, 15A, 60 Hz dedicated service.
An equipment grounding terminal is provided in the field wiring compartment. To reduce the risk of
electrical shock, this terminal must be connected to the grounding means provided in the electrical supply
panel with a conductor equivalent in size to the circuit conductors supplying this equipment.
Install this unit in accordance with the Canadian Electric code, Part I.
Table of Contents
Important Information .............................................................. 2
Important Product Information ....................................................... 2
Product Notices ................................................................ 2
Product Inspection .............................................................. 2
Factory-Assembled Features ...................................................... 2
Connections and Service Access ................................................... 2
Electrical Requirements .......................................................... 3
Thank You For Choosing Kohler Company .............................................. 4
Recommended Tools and Materials ................................................... 4
Introduction ..................................................................... 4
Before You Begin ................................................................. 4
List of New Terms ................................................................ 5
Roughing In Information ............................................................ 7
Construct the Stud Framing ......................................................... 7
Install the Rough Plumbing .......................................................... 7
Prepare the Unit ................................................................. 7
Position the Unit ................................................................. 8
Install the Plumbing ............................................................... 8
Make the Electrical Connections ...................................................... 9
Test Run the Bath ................................................................ 9
Check the Connections and Fill the Unit .............................................. 9
Test the Control Switch .......................................................... 9
Complete the Finished Wall or Deck .................................................. 11
Install the Faucet Trim ............................................................ 11
Clean-Up After Installation ......................................................... 11
Using Your Bath ................................................................. 12
Fill the Bath .................................................................. 12
Operating Sequence ........................................................... 12
Chromatherapy Light Operation ..................................................... 13
Kohler Co. 3 1012493-2-A