Kohler K-T154-3-BN Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Install the Handles
Determine the thickness of the finished wall.
If the finished wall is less than 5/8 (1.6 cm) thick, use the
supplied hardware kit numbered 1031092.
If the finished wall is 5/8 (1.6 cm) to 1-1/4 (3.2 cm) thick, use
the supplied hardware kit numbered 1031091.
Place a stem extension on the valve stem. Secure with the screw
provided.
Thread a threaded sleeve onto the valve body.
Thread a sleeve extension onto the threaded sleeve.
Apply plumbers putty or other sealant to the back of the
escutcheon according to the putty manufacturer’s instructions.
Thread an escutcheon onto the threaded sleeve. Remove any
excess putty or sealant.
Position the handle on the stem extension. Turn the handle to the
closed position (Hot = Counterclockwise, Cold = Clockwise).
Repeat the procedures with the second handle.
Stem Extension
Screw
Escutcheon
Bonnet
Handle
Threaded Sleeve
Valve Body
Setscrew
Sleeve
Extension
Apply plumbers
putty.
1031911-2-A 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 15 16

Comments to this Manuals

No comments