Kohler K-1162-G-0 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Product Information (cont.)
Connections and Service Access
NOTICE: Provide unrestricted service access to the blower motor and check valve. The access must be
located immediately next to the blower motor. Study the roughing-in information packed with the bath.
Before installation, ensure that there is proper access to the blower motor and final connections. If the blower
motor is installed in an enclosed area, an access panel is required at the blower motor. This panel should be
18 (45.7 cm) wide and 14 (35.6 cm) high minimum.
Table of Contents
IMPORTANT SAFETY INSTRUCTIONS ................................................ 2
Product Information ............................................................... 2
Electrical Requirements .......................................................... 2
Product Notices ................................................................ 2
Factory-Assembled Features ...................................................... 2
Connections and Service Access ................................................... 3
Tools and Materials ............................................................... 3
Before You Begin ................................................................. 4
Prepare the Site ................................................................. 5
Prepare the Site - Concrete Construction ............................................... 6
Prepare the Bath with Airjets ........................................................ 6
Secure the Unit .................................................................. 7
Option Using a Cement or Mortar Bed ............................................... 7
Option Using Construction Adhesive ................................................. 7
Option Using Silicone Sealant ..................................................... 8
Install the Plumbing ............................................................... 8
Make Electrical Connections ......................................................... 9
Test Run the Bath with Airjets ....................................................... 10
Complete the Finished Deck ........................................................ 11
Clean-Up After Installation ......................................................... 11
Confirm Proper Operation .......................................................... 12
Fill the Bath .................................................................. 12
Troubleshooting Procedure ......................................................... 14
Troubleshooting Guide .......................................................... 14
Tools and Materials
Pencil
Safety Glasses Level
Silicone Sealant Measuring Tape
Pipe Wrench
Plus:
• Drop Cloth
Construction Adhesive (Optional)
Cement or Mortar (Optional)
• 2x4's or 2x6's
• Hammer
• Flat-Blade Screwdriver
• #6 Large-Head Galvanized Nails
• Conventional Woodworking Tools
and Materials
Kohler Co. 3 1034591-2-F
Page view 2
1 2 3 4 5 6 7 8 ... 47 48

Comments to this Manuals

No comments