2. Install the Urinal
The sides should have at least 1/2” (1.3cm) of sand cushion.
For proper drainage, the lip of the urinal should be installed below
the floor level.
The finished floor should slope toward the urinal lip.
CAUTION: Risk of personal injury or product damage. Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
Carefully position the urinal in the sand cushion.
Use a level to adjust the urinal in the sand cushion.
Install the finished floor.
NOTE: Do not rigidly secure the urinal to the floor or walls.
Fill the gap between the urinal and the finished floor with
waterproof compound.