Kohler K-737-K-NA Installation Guide Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
Tools and Materials
Before You Begin
IMPORTANT! Risk of product damage. Do not apply direct heat
to the valve. Excessive heat will damage the plastic components and
plaster guard.
IMPORTANT! This valve is not intended to be used as a shut-off
valve. If less than three accessories will be installed, do not plug any
outlets without completing the two-way conversion.
Observe all local plumbing and building codes.
Do not remove the plaster guard until instructed to do so.
A mixed water supply is required for this valve.
Read these instructions and plan the installation before beginning.
Component location, spacing, and situational requirements can
vary.
Shut off the water supply.
Inspect the waste and supply tubing; replace if necessary.
Plus:
• 1/2" Piping or Copper
Tubing for outlets
• 3/4" Piping or Copper
Tubing for inlets
• 1/2" NPT Plug
Tubing Cutter
Solder
Thread Sealant
Propane
Torch
Hex Wrench
1/4"
1205548-2-B 2 Kohler Co.
Page view 1
1 2 3 4 5 6 7 ... 23 24

Comments to this Manuals

No comments