Kohler K-9515-AF Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Información importante (cont.)
NOTA: Es posible que las normas de plomería requieran que se instale una válvula
rompevacío (como la K-13056 de Kohler) en línea con la ducha de mano. Consulte las
normas de plomería locales.
Cumpla con todos los códigos locales de plomería y construcción.
1. Slide Bar Installation
Using the escutcheon, mark the mounting holes for the bottom bracket onto the
wall.
Mark the centerlines for the top bracket mounting holes. Refer to the illustration
above for measurements.
Verify the marked locations are both level and plumb.
Verify all marked locations are over a stud or other sufficient backing.
IMPORTANT! Predrill through the wall surface only, not into the studs.
Using a 3/16 drill bit, predrill at each marked location.
NOTE: The slide bar can be installed with or without the escutcheons.
Secure the escutcheon (optional) and bottom bracket with the three screws.
Press the cover onto the bottom bracket.
Bracket
Support
Soporte
Escutcheon
Applique
Chapetón
Cover
Couvercle
Tapa
22-7/16"
(57cm)
23-3/4"
(60.3 cm)
Escutcheon
Applique
Chapetón
Kohler Co. 3 1148057-2-A
Page view 2
1 2 3 4 5 6 7 8 ... 15 16

Comments to this Manuals

No comments