2. Install the Steam Head(s)
NOTICE: Do not obstruct the steam head with shut-off valves, plugs, or caps.
Subtract 1-1/4 (3.2 cm) from the marked length to determine the appropriate nipple size.
Choose a nipple length within 1/8 of the appropriate nipple size.
Apply thread sealant to the threads on one side of the nipple and thread that side into the steam
head housing until hand-tight.
Apply thread sealant to the threads on the other end of the nipple.
Position the gasket around the steam head housing so that it will be between the finished wall and
the steam head housing flange.
Usea1 socket to thread the steam head housing assembly into the elbow in the wall.
Make sure the gasket is compressed and a good seal has been achieved around the edges of the
steam head housing.
Use an appropriate sealant to achieve a watertight seal if needed.
Press the steam head assembly into the steam head housing with the aromatherapy well positioned
on the top of the steam head.
Steam
Head
Steam Housing
1/2" NPT
Elbow
Steam
Head
Lip
Wall
Aromatherapy
Well
Nipple
Steam
Housing
Apply thread sealant.
Apply
thread sealant.
1069332-2-C 6 Kohler Co.