Kohler K-610-6B-KB Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Supply Tee Installation
From the underside of the lavatory, thread the shank nut about
halfway up onto the spout shank. Slide the metal washer onto the
spout shank.
Insert the plastic gasket and the rubber washer into the supply
tee.
Slide the metal washer onto the spout shank.
Thread the supply tee onto the spout shank until hand tight.
Ensure that the arms of the supply tee are aligned to face the left
and right sides of the lavatory.
Tighten the hex end of the supply tee with a wrench. Do not
overtighten.
Slide the metal washer down to the supply tee and thread the
shank nut down to the metal washer. Securely tighten with a
wrench. Do not overtighten.
Slide the O-ring over the guide tube and securely tighten the nut
to the supply tee sleeve with a wrench. Do not overtighten.
Slide the O-ring all the way up the lift rod.
Securely hand tighten the nut on the lift rod until a desired
resistance is achieved.
Supply Tee
Supply Inlet
O-Ring
Guide Tube
Metal Washer
Shank Nut
Rubber Washer
Spout Shank
Plastic Gasket
Tee Hex-End
Guide Tube Nut
1000959-2-B 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 39 40

Comments to this Manuals

No comments