Kohler K-411-NA Installation Guide Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
Please read all instructions before you begin.
Shut off the main water supply.
Observe all local plumbing and building codes.
Products purchased separately may change valve placement and
alignment.
Provide an access panel to the valves for servicing.
Installer-supplied copper tubing is to be: 5/8 O.D. (1/2 Nom.).
The finished deck material must fit closely to the diameters of the
plastic guards.
The spout plaster guard diameter is 7/8 (2.2 cm) for the spout.
Leave the protective sleeve on the spout supply tube until spout
installation. This is an O-ring sealing surface which may be
damaged when unprotected.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
Drill
Solder
Tape
Measure
Tubing
Cutter
Propane
Torch
Thread
Sealant
Plumbers
Putty
Assorted
Screwdrivers
Adjustable
Wrench
1010568-2-B 2 Kohler Co.
Page view 1
1 2 3 4 5 6 7 ... 19 20

Comments to this Manuals

No comments