Kohler K-1154-47 Installation Guide Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
10. Test Run the Whirlpool
Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2 (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to Confirm Proper Operation.
Fill with water at least 2" (5.1 cm)
above the highest jet.
Turn the jet trim ring
clockwise to
decrease the flow.
Position the jet
nozzles to direct
the water flow as
desired.
Turn the jet trim ring counterclockwise
to increase the flow.
Press the air switch to turn the
whirlpool on or off.
Kohler Co. 13 1010564-2-H
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 59 60

Comments to this Manuals

No comments