Kohler K-1154-47 Installation Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
12. Complete the Finished Wall
Tiled Ledge Installation
If you have not already done so, carefully remove the protective tape from the whirlpool rim.
Cover the framing with water-resistant wall material.
Tape and mud the water-resistant wall material. Install the finished wall to the water-resistant wall
material.
Seal the joints between the whirlpool rim and the finished wall material with silicone sealant.
Install the faucet trim according to the instructions packed with the trim.
13. Clean-Up After Installation
When cleaning up after installation, do not use abrasive cleansers, as they may scratch and dull the
whirlpool surface. Use warm water and a liquid detergent to clean the surface.
Remove stubborn stains, paint, or tar with turpentine or paint thinner. Do not allow cleaners
containing petroleum distillates to remain in contact with any whirlpool surfaces for long periods
of time. Remove plaster by carefully scraping with a wood edge. Do not use metal scrapers, wire
brushes, or other metal tools. Use a powder-type detergent on a damp cloth to provide mild
abrasive action to any residual plaster.
14. Confirm Proper Operation
Fill the Whirlpool
NOTE: Please read these steps carefully before you operate your whirlpool.
Position the jet nozzles so they face down toward the basin. Turn the jet trim rings fully
counterclockwise.
Fill the whirlpool to a water level at least 2 (5.1 cm) above the top of the highest jet.
NOTE: The water temperature in the whirlpool should not exceed 104°F (40°C).
To service orifices insert a pencil into the end of the jet nozzle and push the orifice out. After
removing any blockage, check the orifice to make sure it is clear and press it into the jet housing.
NOTE: Orifices are only installed in whirlpool jets when there are six or more jets in the whirlpool system.
Operating Sequence
Press the air actuator to turn on the whirlpool jets.
Apply silicone
sealant to the
joint between the
finished wall and
the whirlpool rim.
Install the finished
ledge material.
First install water-resistant
wall material.
Install the finished
wall material.
Apply silicone sealant to the
joint between the finished
wall and the whirlpool rim.
Finished
Ledge
Whirlpool Flange
Framing
Kohler Co. 15 1010564-2-H
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 59 60

Comments to this Manuals

No comments