Kohler K-302-K-NA Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Bath and Shower Installation
NOTE: Typical dimensions for bath and shower installations are
shown on the rough-in diagram.
NOTE: Refer to the trim installations for specific requirements.
NOTE: Refer to the handle installation instructions for possible
rough-in depth requirements.
NOTE: The faucet fitting is factory assembled for hot and cold
water.
Unless otherwise instructed, rough-in the supply yoke 2-1/4 (5.7
cm) minimum to 3 (7.6 cm) maximum from the centerline of the
yoke to the outside of the finished wall.
Install 1/2 hot and cold supply tubing.
If specified, install the screwdriver stop valves.
NOTE: The 3-valve yokes have no embossed graphics for the
showerhead and spout locations.
Elbow
Elbow
Adapters
1/2" Copper
Tubing
1/2" Copper
Tubing
Temporary
Nipple
Temporary
Nipple
Yoke
Stop
Valve
1/2"
Piping
1/2"
Piping
1/2" Copper
Tubing
1/2"
Threaded
Pipe
Union
1/2"
Sweat
Copper
Union
113212-2-AC 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 23 24

Comments to this Manuals

No comments