Kohler K-8023-BV Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
1. Install the Pipe Nipple and Elbow
NOTE: Choose a 1/2 NPT pipe nipple with a length that will
ensure the 45° street elbow extends 1-1/18 (2.86 cm) from the
finished wall surface.
NOTE: The minimum distance between the front of the 90° pipe
elbow to the front of the finished wall must be 1-5/8 (4.1 cm).
Apply thread sealant to both ends of the pipe nipple.
Thread one end of the pipe nipple into the 90° pipe elbow.
Apply thread sealant to the male threads of the 45° street elbow
over the pipe nipple.
Install the 45° street elbow to the pipe nipple.
Verify the 45° street elbow extends 1-1/8 (2.9 cm) from the
finished wall surface.
Run water through the system to flush out all dirt and debris.
1-5/8"
(4.1 cm)
Min
1-1/8"
(2.9 cm)
Nipple
Finished
Wall
Cutout
3" (7.6 cm) D.
Street
Elbow
Kohler Co. 3 1046519-2-B
Page view 2
1 2 3 4 5 6 7 8 ... 19 20

Comments to this Manuals

No comments