Kohler K-9439-2BZ Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Adjust the Handle Assembly
Ensure the valve stem adapter is lightly placed over the spline
adapter.
Place the handle assembly over the valve stem adapter.
Turn the handle assembly clockwise until the stop is contacted.
The valve will be in the full cold position. The handle should be
between the 9 and 10 o’clock positions.
Rotate the handle assembly counterclockwise, through the detent,
then to the high temperature limit stop.
Verify that the handle assembly is between the 3 and 4 o’clock
position.
Rotate back to 6 o’clock position.
Remove the handle assembly and set aside.
To adjust for handle alignment:
NOTE: The spline adapter allows fine adjustment of the handle
alignment.
Remove the handle assembly and the valve stem adapter.
Reposition the spline adapter.
Reinstall the handle assembly and the valve stem adapter.
Check the alignment. Repeat this procedure until the handle
alignment is satisfactory.
Valve
Spline Adapter
Valve Stem
Adapter
Handle
Assembly
1041503-2-H 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 27 28

Comments to this Manuals

No comments