Kohler K-T13494-4-2BZ Installation Guide Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4. Complete the Installation
Install the Handles
Install a long stem extension onto each valve body.
Secure each long stem extension with the screws (provided).
Close the valves (hot = clockwise, cold = counterclockwise).
Thread a handle onto each valve body.
Confirm the base of each handle is flush with the finished deck.
NOTE: If the handles are not flush: Remove the handles and long stem extensions
from the valve bodies. Install and secure short stem extensions to the valve bodies.
Close the valves, then reinstall the handles onto the valve bodies.
With the valves closed, position each handle with the lever facing away from the
spout.
NOTE: If adjustment is needed, remove the handle, then reposition the stem
extension. Reinstall the handle. Repeat until the desired alignment is achieved.
Installation Checkout
With the handles in the closed position, turn on the main water supply.
Check for leaks. Adjust as needed.
Turn the handles to the full open position to run water through the spout.
Check for leaks. Adjust as needed.
Turn the handles to the full closed position.
Terminer l’installation
Installer les poignées
Installer une longue extension de tige sur chaque corps de valve.
Fixer chaque longue extension de tige avec des vis (fournies).
Screw/Vis/Tornillo
Valve/Valve/Válvula
Short stem extension
Extension de tige courte
Extensión corta de la espiga
Long stem extension
Extension de tige longue
Extensión larga de la espiga
Handle/Poignée/Manija
1111587-2-B 8 Kohler Co.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 19 20

Comments to this Manuals

No comments