Kohler K-14037-G-96 Installation Guide Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4. Position Two Foot Clips (Without Shroud)
Turn the bath shell over and set it in position on the finished floor. Make sure the drain lines up
with the drain pipe and there is no drain interference with the floor.
Position each locking plate with the hole to the outside of the bath.
Trace around the edges of the two foot clips located at the front of the bath, opposite the overflow.
Lift the bath and turn it upside down on saw horses.
Finished Floor
Drain Pipe
Overflow
Bath
Front
Locking Plate
with Hole
Drain
1220597-2-D 8 Kohler Co.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 59 60

Comments to this Manuals

No comments