Kohler K-705810-L-ABV Installation Guide Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
3. Complete Remaining Cuts
CAUTION: Risk of personal injury. Always wear safety glasses while cutting.
Temporarily secure the wall jambs to the side walls of the finished opening with masking tape.
Orient the wall jambs so the screw holes face the inside of the shower and the Top label is at the
top.
Carefully measure the distance (B) between the top of the wall jambs. Mark this distance on the
header and expander.
Carefully measure the distance (C) between the bottom of the wall jambs. Mark this distance on the
threshold.
Cut along the inside of the marked line to cut the header, expander, and threshold to length.
Use a file to remove any burrs where the cuts were made.
Threshold
Header
Header
Expander
B
C
Left Wall
Jamb
Pre-drilled Holes
on Inside of Shower
Outside of Shower
Right
Wall Jamb
Shower
Ledge
Measure distance "B" and "C".
1144162-2-B 6 Kohler Co.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 59 60

Comments to this Manuals

No comments