Kohler Discovery User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
20
Push up and Latch
over the Top of the
Backplate
Align Flow Lever
as Shown
‘Click’ into Position
5. Align the flow control lever so that the
lever is pointing up (refer to illustration).
6. Slide the flow control lever and
concealing plate over the flow control
hub.
7. Latch the top of the concealing plate
over the top of the backplate.
Note! You will need to push the
concealing plate up and over the lip
on top of the backplate (refer to
illustration).
8. Clip the bottom of the concealing plate
into position.
9. Align the temperature control knob with
the hub and push the knob onto the
concealing plate.
Note! If the finished wall thickness is
less than 8 mm the temperature hub
spacer will need to be removed, refer
to section: ‘Commissioning’.
Note! The Thermostatic Shower
Control is preset to approximately
43°C at the factory. If adjustment is
required, refer to section:
‘Commissioning’.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Comments to this Manuals

No comments