Kohler K-2356-8-96 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Preparation (cont.)
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Kohler Co. 3 1018888-2-E
Page view 2
1 2 3 4 5 6 7 8 ... 15 16

Comments to this Manuals

No comments