Kohler K-101-PB Installation Guide Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
11. One-Piece Lever Handle Installation
Verify that the valves are in the closed position.
Insert the handle onto the stem extension so the handle is
positioned horizontally.
Verify that the handle is in an even horizontal position. If needed,
remove the handle and adjust its position on the splines of the
stem extension until horizontal. For fine adjustment, pull out the
stem extension until it disengages from the valve, rotate, and
return it to its original position. Do not pull the stem extension
completely out.
NOTICE: Risk of product damage. Do not overtighten.
Overtightening will damage the handle.
Insert the stem screw into the stem extension and tighten with a
screwdriver.
Repeat for the other handle.
Open
Close
Open
Hot Cold
Close
Lever
Handle
Stem
Extension
Stem
Screw
Bonnet
Shown in Closed Position
1008209-2-G 14 Kohler Co.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 51 52

Comments to this Manuals

No comments