Kohler K-101-PB Installation Guide Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
5. Wall-Mount Supply Installation
Determine the faucet installation location.
Install support framing at the installation location as shown.
Secure the piping to the framing.
Install temporary plugs in the supply ells.
Turn on the water supplies and check for leaks.
Turn off the water supplies.
Complete the finished wall.
In the finished wall, drill two 1 (2.5 cm) holes measuring 8
(20.3 cm) apart from the center of each hole.
Drill a 1/2 (1.3 cm) hole at the exact location illustrated. This
hole must be through the plywood support.
Remove the temporary plugs from the water supply ells.
Support
Framing
1/2"
Copper
Tubing
Minimum 1/2"
Plywood
Supply Ells
11-3/8"
(28.9 cm)
11-3/8"
(28.9 cm)
This hole must be centered,
and must be through
plywood support.
1" (2.5 cm) Diameter Holes
8" (20.3 cm)
Center-to-Center
1/2" (1.3 cm)
Diameter Holes
1008209-2-G 8 Kohler Co.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 51 52

Comments to this Manuals

No comments