Kohler K-11344-G-0 Installation Guide Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
6. Make the Electrical Connections Canada
WARNING: Risk of electric shock. Make sure the power has been disconnected before performing
the following procedures.
WARNING: Risk of electric shock. Connect the blower motor to a properly grounded,
grounding-type Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device (RCD). This
will provide additional protection against line-to-ground shock hazard.
Locate and secure each supplied junction box a minimum of 1-1/2 (38 mm) above the subfloor.
The bath controls and system have been prewired at the factory. A qualified electrician should make
a routine service connection to the junction box.
Connect service to the junction box. The 60 Hz model junction box contains black and white wires
and a ground lug.
A 120 V, 15 A dedicated circuit is required. Provide a Class A GFCI or RCD.
Provide a separate equipment grounding conductor for the inside ground or ground lug. The
conductor must not be connected to any current-carrying conductor.
Bond in accordance with national and local codes.
The junction box should be
wired as shown.
Bond in accordance with
national and local codes.
Black
Supply
White
Electrician to
provide suitable
strain relief.
Blower Motor
Electrical Cord
Ground (Green with Yellow Stripe)
Wire Connectors
From Blower Motor
From Blower Motor
L1
Black
N White
GND
Green with Yellow Stripe
1220597-2-A 10 Kohler Co.
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 43 44

Comments to this Manuals

No comments