Kohler K-6228-C15-BV Installation Guide Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
1. Install the Supplies
IMPORTANT! The diagram illustrates a right side handle installation. The supply
can also be installed with the handle on the left side.
CAUTION: Risk of property damage. When installing the handle on the right side,
connect the supplies to the mixer valve with the cold supply line plumbed on the left
and the hot supply line plumbed on the right. When installing the handle on the left
side, connect the supplies to the mixer valve with the cold supply line plumbed on
the left and the hot supply line plumbed on the right. Disregard the cold label on the
mixer valve.
Install 1/2 supply lines to the mixer valve with the cold supply on the left and
the hot supply on the right.
Temporarily remove and retain the plaster guard/retaining ring tool and spout
plug.
Position a bucket in front of the spout shank, then turn on the water supplies to
the mixer valve.
Slowly open the mixer valve stem. Allow hot and cold water to flow from the
water supplies for approximately one minute to remove any debris.
Close the mixer valve stem. Carefully inspect all connections for leaks.
Reattach the plaster guard/retaining ring tool and spout plug.
Installer les alimentations
IMPORTANT! Le diagramme illustre une installation de poignée sur le côté droit.
L’alimentation peut également être installée avec la poignée sur le côté gauche.
Hot Supply
Alimentation chaude
Suministro de agua caliente
Cold Supply
Alimentation froide
Suministro de agua fría
Plaster Guard/
Retaining Ring Tool
Renfort en plâtre/
Outil d'anneau de retenue
Herramienta para protector de
yeso/anillo de retención
Spout Plug
Bouchon de bec
Tapón del surtidor
Mixer Valve Assembly
Mitigeur
Montaje de la válvula mezcladora
1095311-2-G 6 Kohler Co.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 27 28

Comments to this Manuals

No comments