Kohler 3.5CFZ User Manual Page 43

  • Download
  • Add to my manuals
  • Print
  • Page
    / 81
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 42
TP-5695 12/93 Scheduled Maintenance 3-15
13. Reconnect battery, negative lead last.
14. Start generator set and allow the set to run for
about 20--30 seconds. Stop generator set and
recheck coolant levelby removing heatexchanger
pressure cap. Add straight coolant, if necessary,
until level is just below the overflow tube opening,
then reinstall pressure cap. Repeat this step until
coolant can no longer be added. This procedure
should give an approximate mixture of 50%
ethylene glycol and 50% water.
15. Wipe up spilled coolant and water with rags.
Dispose of rags in a proper container.
16. Test run generator set for about five minutes and
check for coolant leaks. This will allow the coolant
mixture to mix completely. Stop generator set.
17. Rinsecoolantflush kit hoses and fittings withclean
water. Store kit for future use.
18. Dispose of used coolant in a proper manner. Do
NOT pollute waterways!
Page view 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 80 81

Comments to this Manuals

No comments