4. Complete Installation on Rough Deck
Set Valve Body Height
NOTE: Use one of the following two formulas to calculate the valve
body clearance required for the finish material at your site.
For tile that is less than 1” (2.5cm) thick, add 1–1/4” (3.2cm) to the
tile thickness. Example: Tile thickness is 3/4” + 1–1/4” = 2” (5cm) of
clearance required.
For tile that is between 1” (2.5cm) and 1–1/4” (3.2cm) thick, add
only 1” (2.5cm) to the tile thickness. Example: Tile thickness is
1–1/4” + 1” = 2–1/4” (5.7cm).
Adjust the threaded collar until the dimension from the top of the
sleeve to the top of the rough deck equals the clearance requirement
needed. Make a note of this dimension. You will use it again after
connecting the supply tube.
Connect Supply Tube
Measure the distance from the bottom of the spout supply tube to
the top of the tee.
Add 1” (2.5cm) to this measurement and cut a piece of copper
tubing to fit into the supply tube and tee port.
Fully loosen the threaded collars but do not remove them.
Cold
Supply
Solder
Solder
Hot
Supply
Tee
Solder
Copper
Tube
Top Of Sleeve
1-1/4" (3.2cm)
Nominal
2" (5cm)
Clearance
3/4"
(2cm)
Mounting
Nut
2-1/8"
(5.4cm)
Max.
Tile
Thickness
Threaded
Collar
Spout Supply Tube
Sleeve
Valve
Body
Rough
Deck
Measure
Distance