Kohler K-2200-0 Installation Guide Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
2. Install the Lavatory
CAUTION: Risk of personal injury or product damage. Handle
with care. Product can break, chip or cause injury if handled
carelessly. Get help lifting the lavatory.
Countertop Installations
Cut out the opening by carefully following the pencil line traced
from the template.
Temporarily set the lavatory into the countertop cutout to check
for fit.
Remove the lavatory from the countertop.
Drill the faucet holes.
Install the faucet according to the manufacturer’s instructions.
Install the drain. For pop-up drains, use the custom linkage
provided with this lavatory instead of the linkage supplied with
the drain.
Install the custom linkage as shown. Adjust and/or bend the
linkage as required to achieve smooth, effective pop-up drain
operation. Only bend the linkage at the location shown.
Apply a 1/8 (3 mm) bead of sealant around the countertop
cutout hole. Apply the sealant approximately 1/4 (6 mm) away
from the cutout hole edge.
Set the lavatory into the countertop cutout. Use care to avoid
smearing the sealant bead. Wipe away any excess sealant with a
clean cloth.
Follow the instructions listed on the sealant label. Allow the
sealant to set for 30 minutes or more before proceeding.
Connect and tighten the trap to the drain, and complete the water
supply connections to the faucet according to the instructions
packed with the faucet.
Run water into the lavatory and check for leaks.
Bend here only.
Adjust here.
Lift Rod
Custom Linkage
1018373-2-B 6 Kohler Co.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 19 20

Comments to this Manuals

No comments