Kohler K-702205-L-NX Installation Guide Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
4. Measure, Cut, and Install the Top Track
Carefully measure the wall to wall opening (dimension D) at the top of the installed wall jambs.
NOTE: For best results, use a 32-teeth per inch hacksaw blade and a miter box.
Subtract 1/32 (1 mm) from dimension D and cut the top track to this dimension.
Taking care not to scratch the finished surfaces, carefully file the rough edges at the cut end of the
top track.
Install the top track over the ends of both wall jambs.
D
Top Track
Top Track Length =
D – 1/32" (1 mm)
Outside of
Shower
Inside of
Shower
Wall Jamb
Top Track
Kohler Co. 9 1054857-2-C
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 47 48

Comments to this Manuals

No comments