2. Construct the Stud Framing
NOTICE: If a shower door will be installed, refer to the shower door installation instructions for any
special framing considerations.
NOTE: When constructing the subfloor, make sure it is plumb and level with respect to the stud framing.
NOTICE: The stud opening tolerance is +1/4 (6 mm) and -0 (0 mm). Carefully measure your fixture
before determining enclosure size. When a fire-rated wall is specified, dimensions are to the inside of the
wall board. Some shimming between the stud frame and the fixture may be required. Dimensions given in
the roughing-in information are crucial for proper installation. Construct the framing and plumbing
accurately.
Construct 2x4 or 2x6 stud framing according to the roughing-in information for your particular
model.
NOTE: If necessary, leave one of the stud pocket walls loose until the shower receptor is moved into
position. After the receptor has been moved into position, and it is aligned to the stud framing, make sure
it is level before fastening. Refer to the Prepare the Receptor section for additional instructions.
Provide double or triple stud framing around the opening of the stud pocket.
Verify that the stud pocket framing is square and plumb.
Verify the subfloor is level. Shim as necessary.
A
B
D
C
K-9393 K-9395K-9394
60"
(152.4 cm)
61-3/8"
(155.9 cm)
48"
(121.9 cm)
A
B
D
C
21"
(53.3 cm)
24"
(61 cm)
30"
(76.2 cm)
42"
(106.7 cm)
36"
(91.4 cm)
37-3/8"
(94.9 cm)
37-3/8"
(94.9 cm)
37-3/8"
(94.9 cm)
23-3/16"
(58.9 cm)
26-3/16"
(66.5 cm)
18"
(45.7 cm)
32-3/16"
(81.8 cm)
20-3/16"
(51.3 cm)
20-3/16"
(51.3 cm)
20-3/16"
(51.3 cm)
43-3/8"
(110.2 cm)
49-3/8"
(125.4 cm)
K-9396 K-9479K-9397
60"
(152.4 cm)
A
B
D
C
24"
(61 cm)
30"
(76.2 cm)
48"
(121.9 cm)
1064933-2-C 6 Kohler Co.