Kohler K-118-4-BN Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
2. Install the Handle Valve
Slide a gasket onto each valve body until it is snug against the
underside of the escutcheon.
NOTE: The valve body marked COLD with a blue tape must be
installed into the mounting hole on the right as viewed from the
front of the sink.
From the top of the sink, insert the valve bodies into the
mounting holes.
From the underside of the sink, slide a washer and a nut onto
each valve body.
Rotate each valve body until the copper tubing faces towards the
outside of the sink.
Firmly hold the valve bodies in place and securely tighten the
nuts with a wrench. Do not overtighten.
Escutcheon
Valve
Body
Gasket
Washer
Nut
113744-2-BB 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 19 20

Comments to this Manuals

No comments