Kohler K-702412-L-MX Installation Guide Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4. Seal and Install the Bottom Track
Thoroughly clean and dry all dust, dirt, and grease from the bottom track and shower ledge
surfaces where the bottom track will sit and the silicone sealant will be applied.
Measure from the left side stop in the wall jamb to the right side stop (dimension A).
Using a pencil, mark dimension A on all three sides of the bottom track.
Along the inside edge of the pencil marks, place a piece of masking tape.
Carefully cut the bottom track along the masking tape edge.
Use a file to remove the rough edges along the cut.
Remove the masking tape.
NOTE: When positioning the bottom track in the wall jambs, move the inside edge of the bottom track
against the small stop first. Then gently push the entire bottom track down until the outside edge is in
position against the wall jamb and the threshold .
Insert the bottom track between the two wall jambs to check for proper fit. The outside of the
bottom track (high side) should face toward the outside of the shower. The inside end of the bottom
track should fit snugly against the back edge of the wall jamb (Inside of Shower)
Remove the bottom track from the wall jambs.
Apply silicone sealant in the groove located on the underside of the bottom track.
Reinstall the bottom track.
Secure the bottom track in place with masking tape.
Apply sealant here.
Bottom Track
Wall Jamb
Top View
Side View
Bottom Track
Outside of
Bottom Track
Stop
Stop
Mark "A"
Apply masking tape
with edge on mark.
Cut at "A".
Bottom Track
A
A
1036565-2-D 8 Kohler Co.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 47 48

Comments to this Manuals

No comments