Kohler K-1914-GRW-0 Installation Guide Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 168
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
8. Disconnect the Components
Installations Requiring Disassembly Only
Disassembly Checkpoint #3
The steps below may not be necessary. It is only required for doorways less than 31 (787
mm). Make sure removing the bath from the frame is required. The bath likely can be
moved into place while attached to the frame.
If the bath can be moved into place without further disassembly, go directly to the
Position the Bath section.
IMPORTANT! Save and organize all screws and hardware. All parts will be reused.
Disconnect the water inlet from the drain valve by loosening the nut. Save the O-ring.
Disconnect the blower connections by loosening the nut.
Disconnect the wire from the back of the blower keypad.
Disconnect the level sensing wires at the controller.
Disconnect the limit switch wires at the controller.
Disconnect the door power wire at the controller.
Disconnect the Bath from the Frame
IMPORTANT! Be careful not to strip or damage the screws when removing them. When the bath is
reattached they will be reused, as will the original holes in each of the wood blocks.
Disassemble the bath from the support frame at the four brackets by removing the two screws.
Nut
Remove all screws
from (4) brackets.
Disconnect level sensing wires.
Bracket
Wood Block
J1
J2
J3
J4
J5
J6
and
Disconnect limit switch wires.
Disconnect drain valve power.
Disconnect door power.
Water Inlet
Power Cord
Drain Valve
Controller
Open
J7
1128535-2-F 18 Kohler Co.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 167 168

Comments to this Manuals

No comments