Kohler K-700-NY Installation Guide Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
7. Complete the Installation
For Drop-In Installations
If required, install grab bars according to the manufacturer’s instructions.
Cover the framing with water-resistant deck material.
Using silicone sealant, seal the joints between the water-resistant deck material
and the edge of the rim.
Tape and mud the water-resistant deck material.
Install the finished deck material 1/16 (2 mm) away from the edge of the rim.
Apply a bead of silicone sealant in the groove between the finished deck and the
rim.
Install the faucet trim according to the manufacturer’s instructions.
Terminer l’installation
Pour des installations à encastrer par le dessus
Si requis, installer les barres d’appui selon les instructions du fabricant.
Couvrir la charpente avec du matériau de comptoir hydrorésistant.
Utiliser du mastic d’étanchéité à la silicone pour sceller les joints entre le matériau
hydrorésistant et le bord du rebord.
Poser du ruban et appliquer le matériau hydrorésistant du comptoir.
Installer le matériau du comptoir fini à 1/16 (2 mm) à l’écart du bord du rebord.
Appliquer un boudin de mastic d’étanchéité à la silicone dans la rainure entre le
comptoir fini et le rebord.
Installer la garniture du robinet conformément aux instructions du fabricant.
Rim/Rebord/Borde
Water-Resistant Deck Material
Matériau hydrorésistant du comptoir
Material de cubierta resistente al agua
Finished Deck Material
Matériau du comptoir fini
Material de acabado de la cubierta
Apply silicone sealant.
Appliquer du mastic à la silicone.
Aplique sellador de silicona.
Framing
Charpente
Estructura de postes
Bath
Baignoire
Bañera
1084188-2-B 14 Kohler Co.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 20

Comments to this Manuals

No comments