Kohler K-301-K-NA Installation Guide Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
9. Install Tile (If Applicable)
Verify that there will be a 3/4 (1.9 cm) to 1-1/4 (3.2 cm)
distance from the top of the valve shoulder to the top of the tile.
If there is not, correct the valve clearance as described earlier.
Install the tile up to the plaster guards on the valves and the
spout supply tube.
Tile
3/4" (1.9 cm) Min.
1-1/4" (3.2 cm) Max.
Valve
Shoulder
Kohler Co. 13 113969-2-AB
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 39 40

Comments to this Manuals

No comments