Kohler K-1914-GRW-0 Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 168
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
Table of Contents
Important Information .............................................................. 2
Product Information ............................................................... 2
Electrical Requirements .......................................................... 2
Product Notices ................................................................ 2
Factory-Assembled Features ...................................................... 3
Connections and Service Access ................................................... 3
Tools and Materials ............................................................... 4
Before You Begin ................................................................. 5
Parts Identification ................................................................ 6
Construct the Framing ............................................................. 7
Confirm the Correct Cutout .......................................................... 9
Install the Drain Lines and Rough Plumbing ............................................ 10
Remove the Shipping Brackets ...................................................... 12
Remove the Door ................................................................ 13
Remove the Pulley Assemblies and Mounting Brackets .................................... 15
Remove the Receptor Tray ......................................................... 17
Disconnect the Components ........................................................ 18
Position the Bath ................................................................ 20
Level and Secure the Bath ......................................................... 22
Attach the Water Supply to the Accumulator ............................................ 23
Install the Receptor Tray .......................................................... 24
Install the Mounting Brackets and Pulley Assemblies ...................................... 26
Install the Door ................................................................. 28
Attach the Counterweights ......................................................... 29
Connect the Components .......................................................... 31
Adjust the Bath Door ............................................................. 32
Seal/Drain System Electrical Connections .............................................. 34
Heated Surface Electrical Connections (if equipped) ...................................... 36
Confirm Airjet Operation ........................................................... 37
Confirm Heated Surface Operation (if equipped) ......................................... 38
Install the Trim Caps and Access Panel ............................................... 39
Install the Finished Wall ........................................................... 41
Troubleshooting ................................................................. 41
Tools and Materials
Hex Wrenches
Removable
Bolt Adhesive
7/16", 9/16" and 7/8"
Open-end wrenches
• Crowbar or small
pry bar
• Metal Shims
• Masking Tape
• Pencil
• Drop cloth or
protective material
• Standard wood working tools
and materials
Plus:
Silicone
Sealant
1128535-2-F 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 167 168

Comments to this Manuals

No comments