2. Prepare the Site
NOTICE: Measure your actual product for site preparation. Note the model number located on the
components end of the bath, then visit the product page at www.kohler.com for additional information.
NOTICE: Do not attempt to remove the hardened casting material covering the wooden support blocks.
The casting material is required to properly position and install the bath.
IMPORTANT! To ensure a successful installation, install the bath on a level finished floor.
IMPORTANT! Make sure the subfloor offers adequate support for the bath.
Remove and discard the thin plastic film covering the support blocks.
Temporarily position the shroud in the installation location.
Verify the shroud is level. If needed, position shims under the shroud.
Using a pencil, trace the shroud hole on the floor.
Remove the shroud and set aside.
Secure any shims to the floor.
Position and install a standard PVC or brass bath drain pipe. Install the drain pipe so it extends
2-1/8 (54 mm) above the finished floor.
NOTE: The drain pipe may need to be trimmed, depending on the drain installed.
Drain Pipe
Shroud
Finished
Floor
Trace the
hole.
Support Block
2-1/8"
(54 mm)