Kohler K-5702-VB-G9 Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
Plan the Installation
For best results, follow the installation sequence below. Detailed instructions are found on the following
pages of this guide.
Recommended Installation Sequence
Determine the locations for the bath components. Refer to the illustration for preferred locations.
Plan the required access panel location for servicing the control amplifier.
Route plumbing supply lines.
Prepare the bath rim, if using a rim-mount faucet.
Mark and install the drain pipe.
Install the bath shroud.
Bind all cables in preparation for the bath installation.
Install an electrical outlet within 24 (610 mm) of the control amplifier location.
Install the bath and drain. Route the bound cables through the bottom of the shroud.
Route the transducer wires to the control amplifier location.
If equipped, route the chromatherapy cable to the control amplifier location.
Connect the transducer wires, user interface cable, optional auxiliary cable, and chromatherapy cable
(if equipped) to the control amplifier.
Route the user interface cable to the user interface location.
Install the control amplifier.
Install the access panel for the control amplifier.
Connect the user interface cable to the user interface, and install the interface.
Connect the control amplifier to the electrical outlet.
Test the functionality of all bath components. Refer to the Homeowners Guide for operation.
Transducer Wires
User Interface
Cable
Chromatherapy
Cable (Some Models)
Optional Auxiliary-In
Cable
Transducer
Ethernet Connector
1237789-2-C 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 59 60

Comments to this Manuals

No comments