Kohler K-702202-L-SHP Installation Guide Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
Tools and Materials
Before You Begin
CAUTION: Risk of injury or product damage. Two people should perform this installation due to
the weight of the door panels.
CAUTION: Risk of injury or product damage. Unframed tempered glass should not contact hard
surfaces or it may shatter. Do not touch the edge of the tempered glass panel with tools or any hard
objects. Do not set unframed tempered glass directly on the floor or any other hard surface without
the protective vinyl surface attached.
CAUTION: Risk of injury or product damage. Do not cut tempered glass. It will shatter.
IMPORTANT! This door is designed to accommodate walls that are less than 3/8 (1 cm) out of plumb.
Verify the area the door will be attached to is within 3/8 (1 cm) or better of plumb. The door may not
function properly if the wall is more than 3/8 (1 cm) out of plumb.
IMPORTANT! Do not remove the protective strip from the bottom of the door panels until after they are
installed.
The shower bath or receptor should be installed/prepared, including finished wall materials, before
continuing.
Before starting the installation, lay out and identify all of the parts. Inspect them for damage.
Once inspected, return the glass panels to their packaging and place them in a safe area until they
are needed.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Safety Glasses
Level
Caulk Gun
File
Knife
Miter Box
Plus:
Drop Cloth
Pencil & Felt
Tip Marker
Claw
Hammer
Tape
Measure
Masking
Tape
Silicone
Sealant
Center
Punch
Drill and
Assorted
Drill Bits
Miter Saw or Hacksaw with
32 Teeth per Inch Blade
Assorted
Screwdrivers
1054857-2-B 2 Kohler Co.
Page view 1
1 2 3 4 5 6 7 ... 47 48

Comments to this Manuals

No comments