Kohler K-2222-4-96 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Use lag bolts (not provided) to install the hanger to the wall
according to the roughing-in information. Make sure the hanger is
level, and is secured to the backing material behind the finished
wall.
Apply four self-adhesive gaskets (provided) to the top edge of the
pedestal as shown in “Install the Lavatory”.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on
the floor centerline location at the required distance from the
finished wall.
Carefully lift the lavatory into place on the hanger and pedestal, and
slowly move the pedestal as required to ensure proper fit in the
desired location.
Kohler Co. 3 1016186-2-A
Page view 2
1 2 3 4 5 6 7 8 ... 15 16

Comments to this Manuals

No comments