Kohler K-2461-F2 Installation Guide Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
1. Prepare the Wall
Measure and mark 33 (83.8 cm) up from the floor. This will be
the height from the top of the 3/4 plywood backing material to
the floor.
NOTE: The front face of the studs and 3/4 plywood backing
material should be flush.
Secure the 3/4 plywood backing material to the studs with
framing nails.
Install the water supply and drain lines according to the
roughing-in information provided with your lavatory. The water
supply nipples must extend at least 3 (7.6 cm) beyond the
finished wall material.
NOTE: Plumbing will be exposed and visible once the vanity
installation is complete. Chrome plumbing fittings are
recommended.
Complete the finished wall. Ensure the finished wall is straight
and plumb, and the floor is flat and perpendicular to the finished
wall.
IMPORTANT! Before installing molding to the finished wall, check
to ensure that it will not interfere with the vanity.
3/4" Plywood
33"
(83.8 cm)
24" (61 cm)
1061218-2-A 4 Kohler Co.
Page view 3
1 2 3 4 5 6 7 8 9 ... 27 28

Comments to this Manuals

No comments