3. Install the Vanity
Position the vanity against the finished wall.
Verify the vanity is level. If necessary, turn the levelers on the
bottom of the vanity counterclockwise to raise the vanity, or
clockwise to lower it.
Mark two pilot holes an equal distance from the centerpoint of
the mounting rail.
Drill two pilot holes through mounting rail at the marked
locations.
Tighten a wood screw through each of the two drilled holes until
the vanity is flush and secure against the finished wall.
Leveler
Vanity
Finished Wall
Mounting Rail
Wood Screw
1061218-2-A 6 Kohler Co.